6 min read
Innovative cable systems enable operation in the capital light rail
In the extensive Capital Light Rail construction project, covering 28 kilometres and linking 29 stations from Ishøj to Lundtofte, UniSeals has played...
1 min read
UniSeals Oct 7, 2025 1:28:04 PM
Aarhus Central Station will undergo an extensive renovation between 2025 and 2026 as part of Banedanmark's strategy to electrify and modernise the Danish railway infrastructure. The project, executed by Aarsleff Rail A/S, includes the renewal and extension of platforms, lowering of tracks to enable overhead current, and installation of new digital signalling systems.
In this context, UniSeals supplied Futura Infra™ cable chambers measuring 1200 x 1200 mm and 1500 x 1500 mm, approved by Banedanmark, along with custom steel frames and recessed covers. These components are vital to ensure reliable, future-proof cable routing that supports the station’s new electrical and digital systems.
UniSeals' solutions are engineered to meet the stringent demands for durability and functionality in complex railway environments. By delivering these critical infrastructure elements, UniSeals helps ensure more efficient, quieter and environmentally friendly rail operations for the future.
Contact UniSeals for reliable cable system solutions that meet Banedanmark’s standards and future demands.
6 min read
In the extensive Capital Light Rail construction project, covering 28 kilometres and linking 29 stations from Ishøj to Lundtofte, UniSeals has played...
5 min read
Aarhus Central Station will undergo an extensive renovation between 2025 and 2026 as part of Banedanmark's strategy to electrify and modernise the...
7 min read
In recent years, Vejle Municipality has experienced several severe floods in the city centre due to rising water levels in the bypass river. To meet...